Empire Welding was contracted to assemble and install the BP Kwinana White Oil Pipeline truss bridge to span the Canning River on the Thornlie Cockburn link of the Metronet project.
Works included assembly of the 11 prefabricated lattice truss sections, re-engineering of the floor plate installation to eliminate hot works, installation of 125 meters of 12” pipeline, and assembly of both antivandal pipeline enclosure and anti-throw protection screens. This project was completed on time and within budget with no harm to personnel and the sensitive wetlands the work area covered.