Our Projects

Newest Alliance/BP Kwol Truss Bridge

Empire Welding was contracted to assemble and install the BP Kwinana White Oil Pipeline truss bridge to span the Canning River on the Thornlie Cockburn link of the Metronet project.

Works included assembly of the 11 prefabricated lattice truss sections, re-engineering of the floor plate installation to eliminate hot works, installation of 125 meters of 12” pipeline, and assembly of both antivandal pipeline enclosure and anti-throw protection screens. This project was completed on time and within budget with no harm to personnel and the sensitive wetlands the work area covered.

Need more info? Get in touch today

Perth Welding & Fabrication Specialists

Let Empire Welding be your one stop fabrication shop that’s willing to listen to your needs and provide practical options around build and delivery of your works which is tailored with easy access to the people coordinating your jobs.